BAHR was established in 1996 and is a trusted adviser to leading Norwegian and international clients. Its practice spans all key commercial disciplines, with a strong emphasis on domestic and international transactions, commercial law advice, and dispute resolution. With 190 lawyers based in Oslo, Bergen, and Tromsø, the team is organised into specialised industry and practice groups, ensuring comprehensive expertise across the full spectrum of client needs. From transactional assistance and tax to commercial advice, finance, and IP, the firm provides holistic solutions tailored to each client. BAHR is particularly renowned for its leading renewable energy practice. The team handles sophisticated, high-profile mandates from prominent industry names, solidifying its position as the go-to firm for comprehensive advice in this vital sector.

Energy Consumption

The total share of renewables in the energy mix in Norway, excluding offshore oil and gas activities, is approximately 76% measured according to the renewable energy directive. Fossil fuels are mainly used for transportation and industrial purposes, while the remaining energy consumption is largely based on electricity.

The share of renewable energy in the Norwegian electricity grid is close to 100%. Approximately 90% of the electricity generation is based on hydropower, with onshore wind power as the second-largest contributor.

If offshore oil and gas activities on the Norwegian Continental Shelf are included in the total domestic energy consumption, the share of renewables in the energy mix is slightly above 50%.

The government is targeting to reduce climate emissions by 55% by 2030. This target will require increased use of electricity and renewable energy for transportation and industrial consumption.

It is estimated that the total share of renewable energy, including the oil and gas sector, must increase to approximately 80% by 2030 if Norway is to reach the target.

Hydropower

Traditionally, hydropower has been the main source of renewable energy in Norway. Even today, hydropower is the most prominent renewable energy technology in terms of electricity produced, accounting for approximately 90% of the total electricity production in 2024. According to official data, the average annual production in the existing hydropower system is estimated at  approximately137 TWh, of which small power plants accounted for approximately 12 TWh. The installed capacity is 33,852 MW.

The potential for significant increases in hydropower production is limited, except for new small hydro plants and capacity upgrades at existing facilities.

Wind Power

Onshore wind power is the second-largest source of renewable energy production in Norway. Wind power currently accounts for approximately 8% of the total electricity production. Onshore wind power has a much shorter history than hydropower, and most of the installed base was constructed between 2015 and 2022. There is significant potential for expanding onshore wind power in Norway, due to excellent wind resources. However, this is a politically sensitive topic due to the impact on local communities and the natural environment.

Offshore wind power is still at an early stage of being developed. In 2023, Hywind Tampen commenced production as the first commercial-scale floating offshore project in Norway. Hywind Tampen provides electricity to oil and gas installations. 

The first auction round for bottom-fixed offshore wind projects was held in 2024, and it is expected that new licensing rounds will be held regularly over the coming years. Offshore wind power is expected to have significant potential due to excellent wind conditions. The government is in the process of identifying new areas for offshore wind that will allow for the construction of 30 GW by 2040.

Solar Power

Solar power is so far not a large contributor to Norwegian electricity production, and accounts for less than 1% of the total electricity that is produced. However, there is increasing interest in developing solar power, and by the end of 2023, slightly more than 600 MW of solar power was connected to the grid according to the NVE. Approximately half of this capacity was installed in 2023.

Heat (Thermal Power)

Heat as a source of electricity production has not been extensively developed in Norway. According to official data, the installed capacity for thermal power production in Norway amounts to approximately 540 MW. Heat is primarily used for district heating in urban areas, rather than for thermal power.

The renewable energy market in Norway has been through a period of extensive political debate about the future of renewable energy, which has resulted in the introduction of new permitting rules for wind power and significant changes to the tax system for both wind power and hydropower.

Despite clear political ambitions to increase production of renewable energy, political sentiment has also been strongly impacted by recent experiences where new production has been rolled out faster than local communities and host municipalities have been prepared to handle. There is also an increased awareness of the conflicts between land preservation and construction of new infrastructure for renewable energy. Finally, it is considered that in a situation where the cost of producing renewable energy is coming down and prices for electricity are rising, it is necessary to establish a tax system which secures long-term tax revenues for the state and for host municipalities.

The introduction of a new ground rent tax for wind power has been one of the most controversial initiatives. The original proposal was to impose a new ground rent tax for onshore wind power of 35%, which would come on top of the general corporate tax rate of 22%. After parliamentary negotiations, the new ground rent tax was reduced to 25%, which was approved for both new projects and existing projects in production.

A related topic concerns the system for licensing new onshore wind farms. New regulations are introduced which aim to reduce the conflict level with local municipalities, including by granting the municipalities a right to veto new projects at an early stage.

Finally, there has been significant focus on constraints and bottlenecks in the electricity grid. Due to limited grid capacity, new rules and practices are in the process of being introduced to give priority to mature projects that require grid capacity over less mature projects.

The result of these issues is that developers and investors experienced a high level of regulatory uncertainty until the new regulations were adopted. This led to very few renewable energy projects being developed in Norway over the past several years. However, with the new regulations in place, this situation is expected to change.

During this period when development of onshore wind and hydropower has be placed on pause, the most important developments have concerned offshore wind. Hywind Tampen commenced production in 2023. The first licensing round for bottom-fixed offshore wind was completed in 2024 with Ventyr emerging as the winner of the first auction. 

The Energy Act (Energiloven), with associated regulations, is the principal law governing the energy market in Norway. The act applies to the production, conversion, transmission, distribution, and use of energy. The term “energy” includes both electrical energy and thermal energy generated in district heating and cooling plants. Consequently, the act applies to all energy transmitted through wires and pipes, excluding petroleum oil and natural gas.

Since almost 100% of all electricity generation is renewable, there is no separate act that specifically regulates the market for renewable energy. However, there are separate legal acts for certain aspects of renewable energy production that involve natural resources, such as licensing of water fall rights, regulating the natural flow of rivers, and licensing and construction of offshore wind.

The Energy Act and the associated regulations are constantly reviewed and updated. The most important update during the last year relates to the licensing system for onshore wind farms as explained above. The specific regulations for licensing of offshore wind is also being developed in parallel with the first auction rounds for offshore wind. There are also new proposals being considered for prioritising grid access for mature projects if there is a shortage of grid capacity, and for allowing the regulators to decline applications for new projects at an early stage if it is clear that a licence will not be granted. 

The Ministry of Energy is the primary regulatory authority in Norway within the energy markets, with responsibilities including implementing the Energy Act, preparing new regulations and developing the general energy policy for Norway.

The Norwegian Water Resources and Energy Directorate (NVE) is a directorate under the Ministry of Energy. NVE is responsible for handling many of the administrative functions under the Energy Act in the first instance, including licensing new projects and control functions to ensure that the act is complied with. Complaints are decided by the Ministry of Energy.

The Norwegian Energy Regulatory Authority (RME) is the national regulator for the Norwegian electricity and downstream gas markets. RME regulates areas such as economic and technical reporting-related network revenues, market access and network tariffs, non-discriminatory behaviour, market conduct and transparency, customer information, metering, settlement and billing, as well as system and market operation. RME has the power to enforce many of the provisions in the Energy Act.

Constructing, owning and operating facilities for production of renewable energy requires a licence, with the exception of some very small projects.

The basic licensing requirement follows from the Energy Act and concerns the facility as such. The objective is generally to ensure that the facility can be safely integrated in the energy system, and that the positive effects outweigh the negative consequences. This licensing requirement is normally not linked to ownership, but relates to the project as such.

In addition, there are ownership requirements for certain types of exploitation of natural resources. Most importantly, the direct or indirect acquisition of the rights to exploit a waterfall requires a specific licence which can only be given to public owners, or limited companies with at least two-thirds direct and indirect public ownership.

Development of offshore wind is also subject to extensive ownership control, which mainly focuses on the financial resources and technical capabilities of the owners.

Ownership and operation of grid assets, and trading in electricity, also requires a licence.

Finally, land use is subject to zoning requirements and local regulations.

There is not a specific system of ownership control relating to renewable energy as such. However, since production of renewable energy generally requires a permit or a licence, there are general transfer restrictions associated with such permits and licences. The main rule is that a permit or licence cannot be sold and transferred without the consent of the government body which has issued the permit. It is also assumed that a transfer of more than 90% of the shares in a limited company which holds a licence shall be viewed as transferring the underlying licence. In most situations, it will be uncontroversial to receive a consent to transfer the licence, provided that the permit or licence relates to the project as such and not the ownership. If the permit or licence relates to the ownership, as for example is the case of waterfall rights which require public ownership, then the transfer will only be approved if the new owner meets the relevant requirements.

Critical infrastructure is also subject to ownership control under the Security Act due to reasons of national security. For example, this may apply to facilities which are of significant importance to fundamental national functions or that are crucial to national security interests. The Security Act includes notification obligations when acquiring a so-called qualified ownership stake in companies where such ownership control applies. A qualified ownership stake is defined as owning at least one-third of the share capital or voting rights in the enterprise.

As a starting point, there are no restrictions regarding access to foreign investment in Norway.

However, exceptions are made especially for large-scale hydropower plants, where at least two-thirds public ownership is required. All foreign investors are considered private investors in this context, including investments by foreign publicly owned entities.

As a result of these ownership restrictions on large hydropower plants, most private investment in Norway towards renewable energy has targeted small hydropower, onshore wind power, district heating and the electricity grid, where there is no restriction on private ownership.

Hydropower

Hydropower is the primary renewable source of electricity in Norway, accounting for approximately 90% of the electricity production in 2024. Large-scale hydropower plants are, with only a few exceptions, owned by public-owned companies. The largest owner is the state-owned enterprise Statkraft. The second-largest owner is Hafslund, which is controlled by the City of Oslo and municipalities in East Norway. Ownership has remained relatively stable over a long period, except for consolidations between local and regional power companies under public ownership.

The situation for small hydro is very different, where several privately owned companies have taken a leading role in developing large portfolios of small hydropower plants. Many of these are backed by private equity and investment funds.

Wind

Wind power is a relatively new source of energy production in Norway and accounts for approximately 8% of electricity production. Most wind power plants were constructed in the period between 2015 and 2021, and many were backed by international investors and infrastructure funds. During 2024, there have been several transactions where these investors have sold to Norwegian public utilities. There is very limited activity to construct new wind farms. This slowdown is due to market uncertainty and the legislative effort to establish a comprehensive and robust regulatory framework for future developments and a new tax framework.

Energy Market

Norway has traditionally produced more electricity than the domestic consumption, resulting in an energy surplus. This situation is about to change with the energy transition and new energy demands from green industries. This is putting pressure on the government to speed up the licensing process for new production of renewable energy.

Natural Gas

As part of the extraction activities on the Norwegian continental shelf, Norway has large reserves of natural gas. A very small portion of the natural gas is used in Norway, with the majority being exported. Norway is considered an important contributor to the gas supply for European countries, but the domestic market for natural gas is virtually non-existent. 

Biogas

The production of biogas is in an early phase in Norway, where the total biogas production amounts to the equivalent of 0.6 TWh, according to biogassbransjen.no. Most of the biogas facilities are publicly owned, but we also see initiatives from private actors.

Production of heat from renewable sources is governed by the Energy Act, where Chapter 5 is dedicated to thermal power plants. According to the Energy Act, thermal power plants cannot be constructed, owned, or operated without a licence. The same applies to the reconstruction and expansion of thermal power plants. The Energy Act contains specific regulations for the pricing of district heating, which a specific regulation in the Energy Act which only applies to thermal power (and no other renewable resources). During the last few years, price regulation of district heating has been frequently discussed.

There are no specific restrictions on private or foreign ownership in district heating.

Hydrogen production is in a relatively early phase in Norway, and there is currently no existing well-developed market for hydrogen. The market is dominated by two types of activities. The first is to develop production facilities for green hydrogen or ammonia, based on the high level of renewable energy in the Norwegian electricity mix. The other is to develop blue hydrogen, using natural gas for the Norwegian Continental Shelf as feedstock combined with carbon capture and storage. These projects still depend on various forms of state support, and few of them have reached the stage of a Final Investment Decision (FID).

The lack of capacity in the power grid is currently a limiting factor for further development of green hydrogen, combined with the declining energy surplus.

Small production plants (with voltage below 1 kV) that can be connected to existing low-voltage installations do not require a licence under the Energy Act. However, such non-licensable installations must be co-ordinated with the municipality in accordance with the provisions of the Planning and Building Act.

Transportation and Storage of Electricity

Statnett, as the Transmission System Operator (TSO), builds, owns, and operates the central power grid. The TSO’s responsibilities include co-ordinating the operation of the power grid, ensuring that electricity capacity is made available to the market, managing areas with limited capacity, and facilitating trade with other countries. Statnett is owned by the Norwegian state.

Though there are no restrictions on private ownership, grid companies on a local and regional level are mostly publicly owned. These companies are subject to monopoly regulation, which affects connection obligations and tariffing. 

Batteries

Batteries are not yet rolled out on a large scale in Norway. This is partly due to the high regulatory capacity and flexibility of hydropower for markets, as well as both voltage and frequency. Consequently, it is anticipated that batteries mainly will be utilised in areas with limited capacity compared to the required capacity (ie, bottlenecks). It is anticipated that batteries will be utilised – ie, at construction sites and ports. In these locations, there is a need for high-voltage electricity during repeated limited time periods, making it possible to achieve the desired capacity regulation and flexibility through the use of batteries.

Grid capacity and grid congestion is increasingly becoming a bottleneck for the production of renewable energy. Since almost 100% of the electricity generation is renewable, the issue cannot be solved by giving priority to renewables in the electricity grid. Traditionally, grid access has been solved on a “first come first served” basis. There are standard contracts for conditional grid access, where the latest producers to connect accept curtailment during peak hours if needed. There is also a process to develop mechanisms to ensure that projects which are not being built do not tie up grid capacity. It is proposed that mature projects should have priority over less mature projects, and that the grid companies should be able to withdraw grid capacity from companies which are not using it or are significantly delayed in developing new projects.

There is a very limited market for natural gas in Norway, and no active market for transportation and storage. 

To establish and operate district heating plants in Norway requires a licence under the Energy Act. The licence relates to the production facility for heat, and to the transportation and distribution network. There are rules which allow for third-party access to the distribution network, but this has not been used in practice. The municipality can require that new buildings within a certain area connect to the district heating network. This is typically used for city planning.

As at the date of writing, there is no grid for the transportation of hydrogen in Norway.

Since almost 100% of all electricity generation in Norway is renewable, there is no separate market for the supply of renewable electricity. Certificates of origin are used to document that the source of the electricity is renewable. Such certificates are typically of importance to industrial users who need to demonstrate a low carbon footprint, for example producers of green hydrogen or green aluminium.

There is no active market for natural gas in Norway, and most sales are managed bilaterally to industrial and commercial users.

District heating is sold under a licence granted pursuant to the Energy Act. Since end users can be required to connect to the local district heating network, there is also a system for price regulation. The maximum price shall not exceed the gross cost of an alternative energy source, which for practical purposes is electricity. The gross price includes grid tariffs, electricity taxes, etc. The system has secured strong margins for sellers of district heating during periods of high electricity prices, but also losses in periods where electricity prices are very low. There are proposals to review the current price regulations to better reflect the market situation today. 

There is currently no liquid market. Hydrogen and biofuels are mainly is produced and sold under bilateral agreements.

There is an active market for guarantees of origin, which follow the general system established by the EU.

There is also an active market for long-term corporate PPAs. Purchasers are traditionally power-intensive industries, such as producers of aluminium. The government seeks to facilitate these industrial PPAs, including through a tax treatment based on the agreed price rather than the prevailing spot price. over the past several years, new users such as datacentres, hydrogen producers and other green industries have emerged as offtakers for long-term PPAs. Most onshore wind power plants that have been constructed in the past several years have been supported by PPAs, typically for a duration of ten to 15 years.

Project development in Norway follows a similar pattern as seen in most other European countries. Even if there are national differences in how permits are awarded and landowner rights are secured, the basic structure and concept behind project development is similar. Norwegian energy projects have proven fully capable of attracting international funding and project financing.

The market for new projects has been dominated by existing utilities, and new private developers. The private developers have normally followed an approach where the project is sold to infrastructure investors after it has been derisked, allowing for the developer to realise a profit based on the full project value.

Offshore wind projects will, as a main rule, be awarded through public auction rounds. The first auction for a bottom-fixed wind farm was completed in 2024, and new auction rounds are expected to be carried out during the coming years. The licensing process starts when an area is being “opened” for offshore wind projects. Interested parties are invited to participate in an action for the right to carry out a full impact assessment and to apply for the final licence. The project is then constructed and put into operation according to the approved development plan. Material deviations or changes will require governmental approval.

The licensing of floating wind farms will, over time, follow the same system. However, due to less mature technology and higher costs, it is still deemed too early to develop such wind farms on a commercial basis. Early-phase licences will therefore be awarded to several companies, which will compete for state aid at a later stage in connection with the application and award of the final licence.

Finally, offshore wind projects are also being developed outside the ordinary system of auction rounds described above. Hywind Tampen was the world’s largest floating offshore wind farm when it commenced production in 2023, and supplies electricity to nearby oil and gas facilities. Hywind Tampen is owned by the same oil companies that will purchase the electricity. Goliat Wind is a similar project linked to an oil and gas facility in North Norway, owned by Vår Energi. 

Project financing of renewable energy depends on the ability of the financing parties to maintain the project as a producing asset in the event of enforcement. Accordingly, it is important to ensure that the relevant permits, licences, landowner agreements and PPAs will survive enforcement where the lenders take control. This has generally been possible to secure through proper structuring of the project, including through pledges and step-in rights. For some types for projects there has been legal uncertainty around which assets are capable of being effectively pledged towards lenders. For new types of projects, such as offshore wind, a legal framework has been lacking. However, these issues are being addressed by the regulators when needed, and so far it has not prevented project financing of renewable energy projects in Norway. 

Subsidies

In Norway, there are several entities offering subsidies and incentives to renewable energy projects, the most prominent being Enova, which is a state-owned enterprise. Enova is managed by the Ministry of Climate and Environment (MCE) and reports directly to MCE. Enova provides financial support to both businesses and individuals and must act in accordance with the governance agreement entered into with the state regarding the management of the funds in the Climate and Energy fund. It is also possible to obtain grants from actors with a more general purpose, such as Innovation Norway.

As Norway is party to the EEA agreement, subsidies from state-owned enterprises are subject to the state aid regulations in that agreement. 

Tax Incentives

Norway does not have any specific tax incentive schemes for renewable energy projects. However, the SkatteFUNN incentive scheme is a general incentive scheme that provides a tax deduction for costs incurred in relation to research and development. In order to qualify for the scheme, the specific project must be approved by the Research Council of Norway.

The overarching regulations for the cessation and decommissioning of renewable energy production facilities are outlined in the Pollution Control Act (forurensningsloven), according to which, the owner or user of the facilities shall take necessary measures to prevent pollution, including through safe and proper decommissioning at the end of the operations. So far there are few examples of actual decommissioning. Hydropower plants have generally been rebuilt and refurbished, and are seen as an asset rather than a liability. The installed base for wind power is so new that it has not yet reached the decommissioning stage, apart from some projects which have been repowered.

There are two main factors that will be the drivers for the development of renewable energy in Norway. The first is the energy transition and targets for cutting emissions, which will lead to a strong increase in the domestic demand for electricity. The other is the expected decline in Norway’s energy surplus, which traditionally has been a competitive advantage for Norwegian industry. As an example, the plans for electrification of the Norwegian Continental Shelf alone will use up the remaining energy surplus.

For these reasons it is expected that the market for developing and constructing new facilities for production of renewable energy will return, and that the coming years will see a strong increase in activity. This will also trigger new large investments in grid infrastructure to receive and distribute new production. Norway has excellent wind resources and access to hydropower resources, and there is a well-functioning and market-based system for electricity. The fundamental requirements for expanding the production of renewables are therefore present.

A key topic will be which sources of renewable energy to prioritise. It is currently considered that offshore wind is favourable in terms of avoiding conflicts with other users of land or nature preservation interests. On the other hand, offshore wind is more expensive to develop and takes many years to put into production. It is therefore believed that in order to meet the demands of the future, it is necessary to develop all relevant sources of renewable energy in parallel, including hydro, wind, solar and heat.

Another key topic is how to develop and manage interconnectors with other countries. The main concern with interconnectors is that they can resulted in “imported” high energy prices, as the Norwegian market becomes connected to the continental European market. At the same time, interconnectors are also important to maintain security of energy supply in periods where Norwegian production is insufficient. Development of new interconnectors will be important for how quickly new renewable energy projects can be developed in Norway, particularly for offshore wind.

BAHR

Tjuvholmen allé 16
NO-0252
Oslo
Norway

+47 21 00 00 50

post@bahr.no www.bahr.no
Author Business Card

Trends and Developments


Authors



BAHR was established in 1996 and is a trusted adviser to leading Norwegian and international clients. Its practice spans all key commercial disciplines, with a strong emphasis on domestic and international transactions, commercial law advice, and dispute resolution. With 190 lawyers based in Oslo, Bergen, and Tromsø, the team is organised into specialised industry and practice groups, ensuring comprehensive expertise across the full spectrum of client needs. From transactional assistance and tax to commercial advice, finance, and IP, the firm provides holistic solutions tailored to each client. BAHR is particularly renowned for its leading renewable energy practice. The team handles sophisticated, high-profile mandates from prominent industry names, solidifying its position as the go-to firm for comprehensive advice in this vital sector.

Energy is the backbone of Norway’s economy. The industrialisation of the country from the early 1900s was based on exploitation of hydropower, with companies such as Elkem, Norsk Hydro, Hafslund and Borregaard developing industrial plants near new hydropower plants. The expansion of hydropower production continued until the 1970s, and resulted in a unique position for Norway as one of a few countries where electricity production is entirely based on renewable energy. This is still the situation today, with wind power supplementing traditional hydropower production.

In the late 1960s, oil and gas were discovered on the Norwegian Continental Shelf. This resulted in the rapid development of the oil and gas industry, which has been of critical importance for Norway. However, this has had limited impact on domestic energy consumption, because of a decision to export oil and gas. For example, natural gas is exported to the UK and Continental Europe through a complex network of gas pipelines, and there is very limited domestic use of natural gas. No domestic network for transporting natural gas has been developed, and the domestic market is based on bilateral supply agreements.

Domestic renewable energy production and offshore oil and gas production have only recently started to impact each other, through initiatives to electrify offshore oil and gas facilities. Since a very high portion of Norway’s CO₂ emissions come from the activities on the Norwegian Continental Shelf, it is necessary to reduce these emissions significantly to reach the national emission targets for 2030 and 2050. This can only be achieved through electrification and will result in a large new demand for electricity. Such demand will require that onshore electricity production is expanded, or that new offshore wind power projects are developed to supply oil and gas facilities.

Hydropower

Hydropower remains the most important source of electricity in Norway, and still accounts for approximately 90% of overall electricity production.

Hydropower is based on exploiting waterfalls, which under Norwegian law belong to the landowner as a starting point. However, because of the importance to the national security of electricity supply, and the public interest in exploiting natural resources, a concession requirement was introduced as early as 1906. A concession is required to directly or indirectly acquire rights to exploit waterfalls that are above a certain threshold based on energy potential.

Under the current legislation, such concessions may only be granted to public entities, or to companies that have at least two-thirds direct and indirect public ownership. As a result, the vast majority of large hydropower plants in Norway are today owned by the state-owned electricity producer Statkraft, or by regional power companies such as Hafslund, Å Energi and Lyse, which are owned by municipalities. The industrial company Norsk Hydro is the only large private owner in the market, based on waterfall rights that were acquired before 1906 or during earlier concession regulations.

There is room for private ownership of up to one-third in companies that own large hydropower plants, and there are some examples of private institutional investors taking such minority positions. However, such investments have so far been limited. Since the public owners have little capacity to invest new capital into these companies, and there is a large need for new investments to meet the future demand for electricity, there is a potential for increased private investments in the future.

The part of the hydropower industry which is open for private investments is small hydro plants. Such plants exploit waterfalls with an energy potential below the requirement for a concession based on public ownership. There is also a strong potential to develop more small-scale hydropower to increase electricity production. This has therefore been a market for professional private developers, who are supported by private equity and infrastructure investors. These developers and investors have created large portfolios of small hydropower plants, which have become an attractive asset class. There is an active market for buying and selling small hydropower plants, both separately or as part of larger portfolios.

Onshore Wind Power

Onshore wind power is the second-largest source of electricity production in Norway, and currently accounts for approximately 8% of annual production. Onshore wind power facilities require a public licence to be constructed. In addition, the developer must secure agreements with the affected landowners and other users of the land, or seek a right of expropriation. There is no requirement for public ownership, and the market is therefore open for private and international investors. Private investors have funded a majority of the onshore wind developments, together with Statkraft and some of the large power companies.

Most wind power projects in Norway were developed and built between 2015 and 2021. During this period, a special support mechanism was in place, in the form of a Norwegian-Swedish market for electricity certificates. Only projects that were completed before 31 December 2021 were eligible to receive such certificates.

Many projects were built during these years, and often with larger windmills than originally contemplated due to improved technology. This resulted in the intended increase of Norway’s annual production capacity for renewable energy, but it also triggered negative reactions from local communities and nature preservation interests due to the environmental impact. When the political climate became more contentious, with demonstrations and protesters attempting to stop new projects, a temporary pause in the processing of all new concession applications was introduced in 2019.

As the government worked to establish a more robust framework for processing concession applications for onshore wind, a proposal was also introduced to increase the taxation of wind power. With rising electricity prices and falling construction costs, the original support schemes with electricity certificates were no longer needed. Instead, it was considered important to secure long-term tax revenues from projects that use land areas and natural resources.

In 2024, the new framework for onshore wind has been adopted. An important new principle in the permitting process, is that it can only be initiated after consent from the host municipality. Furthermore, a new ground rent tax of 25% has been introduced, which comes on top of the corporate tax rate of 22%. Some of these new tax revenues will be used to compensate the host municipalities. Finally, the protection offered to reindeer herders and other affected users of the land has been strengthened, following a high-profile case where the Supreme Court found that the human rights of indigenous reindeer herders were violated by a large wind farm project. 

The high political tension around onshore wind, and the regulatory uncertainty that existed, resulted in a complete stop in the development of new onshore wind projects. No new projects of scale have been developed since the first round of projects were completed in 2021/2022. It is anticipated that the market for developing new wind farm projects will reopen, with a special focus on areas where there is a strong local need for production or where natural preservation interests are less affected. An example is Finmark in Northern Norway, where new renewable energy is needed to electrify onshore and offshore oil and gas facilities.

Offshore Wind Power

Offshore wind power is in a very early stage of being developed in Norway.

In 2023, the first commercial scale offshore wind farm was opened. The project is named Hywind Tampen, and is a floating offshore wind farm constructed to supply oil and gas installations in the North Sea. A similar project named GolatVIND is under development in the Barents Sea, and is a demonstration project of floating offshore wind production intended to supply the Goliat field with electricity.

In 2024, the first auction round for development of bottom-fixed offshore wind was completed. The project area is called Sørlig Nordsjø II (SNII), and is located in the very south of the Norwegian sector of the North Sea close to the Danish sector. The project will only be connected to the Norwegian mainland.

The project is supported by a contract for difference, and the right to develop the project was won by Ventyr. It is anticipated that new areas will be opened for bottom-fixed offshore wind in the coming years, and that there will be regular auction rounds to award these areas. For future projects, it is likely that hybrid cables that are connected to both Norway and Continental Europe will be permitted, which may make the projects economically viable without public subsidies or support.

There is also an ongoing process to hold licensing rounds for offshore floating wind power. These projects have a hight cost base and will require public support. The detailed principles for the auction and the support scheme are in the final stages of being developed, subject also to approval by ESA.

There has been significant interest in the potential to develop offshore wind in Norway. Even if the industry has had a slow start, it is anticipated that interest will increase as more areas are made available. The projects benefit from excellent wind resources, and less conflicts with other users compared to onshore wind.

Other Sources of Renewable Energy

Up until now, solar power has not been subject to extensive developments, and currently accounts for less than 1% of the total electricity production in Norway. However, the last couple of years have seen a spike in new projects being developed. By the end of 2023, slightly more than 600 MW of solar power connected to the grid in Norway, according to NVE. During the course of 2023, approximately 300 MW was connected to the grid, which means that the amount of installed solar power capacity connected to the grid during the course of 2023 was doubled. This trend seems to have continued into 2024.

District heating is also an important sector, with heat being supplied from waste-to-energy plants, biomass plants, and excess heat from industrial plants. District heating is favoured for new urban developments, where the municipality has the right to require new projects to connect to district heating networks. District heating is subject to price regulations, which are aimed to ensure that end users do not pay more than what they would have paid if they used electricity. The profitability in the sector is highly dependent on how the price regulations apply to shifting market conditions, and new proposals are currently being considered to update and improve the system.

Grid

Having a robust and efficient electricity grid is crucial for succeeding with the energy transition. The grid needs to handle increased production, new consumption, and sources of intermittent electricity like solar, wind and small hydro.

The existing electricity grid is not dimensioned to handle these changes, and large investments are needed to strengthen the grid. This will require both capital and time, which means that grid congestion and bottlenecks will be an issue in the years to come.

Since all electricity production is based on renewable energy, the congestion issues cannot be solved by giving renewable energy preference over electricity produced from other sources. Instead, the main issue has been to determine which projects to prioritise for new grid capacity, and how to withdraw reserved grid capacity from projects that are not being developed.

A proposal is now being considered where the grid operators shall give priority to projects that are most mature, instead of applying the traditional “first come first served” approach. New projects with reserved capacity must commit to certain development milestones, and will risk losing grid capacity if the project is significantly delayed.

A related topic is the development of interconnectors between Norway and other countries. Interconnector capacity is still limited, which means that the electricity prices in Norway are lower than in neighbouring countries as long as there is a surplus of electricity. However, two new interconnectors to Germany and the UK were opened in recent years, which are believed to have caused an increase in the domestic power prices. Even if these interconnectors are also improving the security of supply, they have been criticised for being used to export electricity at the expense of the domestic power market. This controversy is also the reason for not allowing a hybrid export cable to be built for the first offshore wind farm at SNII.

Green Industries

The high share of renewables in the electricity mix in Norway has attracted many initiatives to develop new green industries. This includes, for example, production of hydrogen, batteries and datacentres. The potential for developing such projects depends on several factors, but grid connection and the availability of long-term power purchase agreements are important. Facilitating new green industries is of high priority to the Norwegian government, which has launched an ambitious plan for green industries in Norway.

Conclusion

Norway has a mature and sophisticated market for renewable energy, and a unique starting point for the energy transition with a high share of renewable energy in the overall energy mix. Hydropower capacity has always been a competitive advantage for Norway, and will continue to be so going forward.

Norway also has some unique challenges. Most importantly, the age of expanding the oil and gas industry is coming to an end, and there is a strong need to develop new industries that can take its place. Electricity will be required to cut emissions on the Norwegian Continental Shelf, and to power new industries that need to be developed.

Secondly, Norway has much larger areas of untouched nature than many other European countries, and a special responsibility to protect this for future generations. Therefore, new renewable energy projects must be developed in a way that balances the affected interests in a sustainable way. It remains a challenge to find this balance, as evidenced by the recent process to introduce a new concession process and new taxation principles. It means that project developments in Norway need to understand and address the relevant interests.

Despite these challenges, it is mainly considered that the energy transition represents an opportunity for Norway. The availability of natural resources, excellent wind conditions, capabilities and technologies from the offshore industries, and the unique hydropower system, gives a strong foundation for future growth and investments. 

BAHR

Tjuvholmen allé 16
NO-0252
Oslo
Norway

+47 21 00 00 50

post@bahr.no www.bahr.no
Author Business Card

Law and Practice

Authors



BAHR was established in 1996 and is a trusted adviser to leading Norwegian and international clients. Its practice spans all key commercial disciplines, with a strong emphasis on domestic and international transactions, commercial law advice, and dispute resolution. With 190 lawyers based in Oslo, Bergen, and Tromsø, the team is organised into specialised industry and practice groups, ensuring comprehensive expertise across the full spectrum of client needs. From transactional assistance and tax to commercial advice, finance, and IP, the firm provides holistic solutions tailored to each client. BAHR is particularly renowned for its leading renewable energy practice. The team handles sophisticated, high-profile mandates from prominent industry names, solidifying its position as the go-to firm for comprehensive advice in this vital sector.

Trends and Developments

Authors



BAHR was established in 1996 and is a trusted adviser to leading Norwegian and international clients. Its practice spans all key commercial disciplines, with a strong emphasis on domestic and international transactions, commercial law advice, and dispute resolution. With 190 lawyers based in Oslo, Bergen, and Tromsø, the team is organised into specialised industry and practice groups, ensuring comprehensive expertise across the full spectrum of client needs. From transactional assistance and tax to commercial advice, finance, and IP, the firm provides holistic solutions tailored to each client. BAHR is particularly renowned for its leading renewable energy practice. The team handles sophisticated, high-profile mandates from prominent industry names, solidifying its position as the go-to firm for comprehensive advice in this vital sector.

Compare law and practice by selecting locations and topic(s)

{{searchBoxHeader}}

Select Topic(s)

loading ...
{{topic.title}}

Please select at least one chapter and one topic to use the compare functionality.