Mazghouny & Co is a boutique law firm based in Cairo that specialises in projects and infrastructure, energy and power, construction and real estate, financing and corporate matters. The team is modern, dynamic and creative, and it has set out to build a different type of law firm that operates not just as a legal services provider, but also as a business partner. The firm provides top client service through a dedicated, innovative and commercially oriented team and it utilises the latest legal technology in the delivery of its services. It has been privileged to support some of the world’s largest multinational companies, funds, developments, commercial and private lenders, and governments, and counts Acciona Energia, Amarenco, BayWa r.e., EDF Renewables, EETC, Engie, juwi, NREA, Scatec, and Voltalia among its clients. Having advised on Egyptian-based projects for many years, the firm’s lawyers have a wealth of experience and contacts within various industries, particularly renewable energy.

Structure of the Power Market and Main Governing Laws

For many years, the power sector in Egypt was based on a single-buyer model, with the Egyptian Electricity Holding Company (EEHC) being the main player and owner of the transmission system and almost all the distribution assets. However, on 8 July 2015, Electricity Law No 87/2015 (the “Electricity Law”) was published, followed on 23 May 2016 by its Executive Regulations issued by Decree of the Minister of Electricity and Renewable Energy No 230/2016, which mandated the independence of the power market segments, with a view to achieving a liberalised and competitive electricity market. The initial timeline for achieving the new market structure was eight years, but on 13 June 2021, Law No 70/2021 amending the Electricity Law was published, and extended this period to ten years, during which time, EEHC should collaborate with all other companies in the electricity sector to ensure the smooth running of the electricity utility.

Mechanisms to reach renewable energy targets

Renewable power generation is governed by a special Law No 203/2014 published on 21 December 2014, which identifies four main mechanisms to reach the country’s renewable energy targets:

  • state-owned projects with competitive bidding on the basis of the engineering, procurement and construction (EPC) contracts’ model;
  • competitive bidding for build-own-operate (BOO) contracts;
  • a feed-in tariff; and 
  • the Independent Power Producer or Merchant Scheme Model according to which, generation companies can enter into bilateral contracts to sell power directly to consumers using the national grid against wheeling and grid-access charges payable to the grid operator.

These laws and regulations are also complemented by circulars, which are regularly issued by the Egyptian Electric Utility and Consumer Protection Regulatory Agency (“EgyptERA”), which is the electricity market regulator in Egypt.

Nuclear power

Nuclear power generation is governed by the Nuclear Activities Law No 7/2010 published on 29 March 2010, which organises Egypt’s Nuclear Materials Authority and the issuance of licences, as well as regulation of all nuclear power plants projects in Egypt. The establishment of nuclear power projects is also specifically governed by the Nuclear Power Plants Construction Oversight Authority Law No 209/2017 published on 29 November 2017.

Alternative energy sources

Solar, wind, hydroelectric, and biomass-generated electricity are the main alternative energy sources currently found in Egypt. The government is working on adding nuclear power to the energy mix within the next few years, and is also working on building a green hydrogen hub in the Suez Canal Economic Zone. Furthermore, green fuel production from green hydrogen, including green ammonia, biomethanol, etc, is increasingly gaining traction, especially in collaboration with stakeholders affiliated with the Ministry of Petroleum and Natural Resources.

Electricity Generation Companies

There are six state-owned power generation companies operating in Egypt, which sell electricity to end-user consumers:

  • Upper Egypt Electricity Production Company (with a total capacity of 6,504 MW);
  • Cairo Electricity Production Company (with a total capacity of 9,299 MW);
  • Hydro Plants Generation Company (with a total capacity of 2,832 MW);
  • East Delta Electricity Production Company (with a total capacity of 10,255 MW);
  • West Delta Electricity Production Company (with a total capacity of 4,303 MW); and
  • Middle Delta Electricity Production Company (with a total capacity of 5,700 MW).

In addition, there is a seventh entity – the New and Renewable Energy Authority (NREA), with a total installed capacity of +1,330 MW and 252 MW under construction as of April 2022 – which sells electricity to the Egyptian Electricity Transmission Company (EETC). 

Three companies are in operation under the BOO scheme with a total capacity of 2,048 MW, namely: Gulf of Suez Energy Company, East Portsaid Energy Company, and Sidi Krir Company for Electricity Generation. There are 36 companies operating under the feed-in tariff programme, 32 of which are located in Benban Solar Park, with a total capacity of 1,465 MW.

There are also 23 other, privately owned licensed generation companies, as well as a number of small or off-grid power generation companies, distributed in several parts of Egypt. According to the latest statistics published by NREA in April 2022, the private sector renewable energy projects in Egypt are equivalent to an installed capacity of +1,970 MW producing +6,720 GWh of energy, in addition to 1,700 MW under construction.

Electricity Distribution Companies

There are nine state-owned electricity distribution companies in Egypt, in addition to 57 privately owned distribution companies, which mainly operate in new residential compounds or tourist resorts.

Electricity Transmission

The EETC is, according to the Electricity Law, the sole owner and operator of the transmission network.

Foreign Investment in the Power Industry

There is no nationality restriction in the power industry. In fact, private investments, including foreign investments, are currently encouraged. However, investment in the generation or distribution streams must, according to the Electricity Law, be channelled through a joint stock company incorporated in Egypt. There is no minimum ownership requirement for Egyptian nationals or any applicable local content, other than that under Labour Law No 12/2003 – a 9:1 ratio of Egyptian to foreign employees applies.

According to Companies Law No 159/1981 (the “Companies Law”), a joint stock company must be incorporated by at least three shareholders, with a minimum share capital of EGP250,000. The company is managed by a board of directors, comprising a minimum of three individual or corporate board members, and must have registered premises in Egypt. Acquisition of participation in existing joint stock companies must be carried out through a formal process involving a stockbroker before the Egyptian stock exchange, even if the company in question is not listed.

Investment Incentives

Electricity generation and distribution activities fall within the scope of Investment Law No 72/2017 (the “Investment Law”), which grants a number of incentives, particularly for companies generating or using renewable electricity. Electricity generation and distribution projects may benefit from:

  • an exemption from stamp duties and registration charges for incorporation documents and financing and mortgage agreements for five years from the date of commercial registration;
  • an exemption from stamp duties and registration charges for documents related to land registration by said projects; and
  • unified customs duties at a rate of 2% for all imported equipment used in the establishment of the project.

Furthermore, projects generating or using renewable energy, and electricity generation and distribution projects determined by cabinet decree, can benefit from a deduction to their net taxable income equivalent to 30% of their investment costs. This may be increased to 50% of the investment costs for those renewable energy projects implemented in the Suez Canal Economic Zone (the “SCZone”), the Golden Triangle Economic Zone, and the New Administrative Capital, as well as areas most in need of development determined by prime ministerial decree.

Additionally, special incentives for green hydrogen projects are expected to be shortly passed into law to encourage the development of this industry in Egypt.

Investment Protections

According to the Investment Law, projects mainly benefit from the following protections:

  • a host of investment protections similar to those found in bilateral investment treaties, such as fair and equitable treatment, national treatment standard, or preferential treatment of foreign investors based on the treatment of Egyptian nationals by the foreign investor’s country;
  • residency to the foreign investor throughout the duration of the project;
  • protection against nationalisation and expropriation without fair compensation; and
  • protection against burdensome administrative orders, etc.

Change in Ownership and Control

While there are no legal restrictions regarding the sale of power industry assets or businesses as such, the power purchase agreements in place would typically provide for change in control and change in ownership limitations or prior approvals.

In government-tendered projects, there is a lock-up period of two to three years from the commercial operation date, typically related to the key shareholder’s participation in the project. Usually, 25–40% of the project has to be maintained by the key shareholder throughout the lock-up period, to ensure the smooth construction and initial operation of the project. Buyers must have at least equivalent financial and technical capabilities as the original project owners and must be approved by the offtaker. If EgyptERA in its role as regulator deems the acquisition an assignment of licence, its approval would also be required.

Acquisitions usually take place through share purchases of the relevant project companies, rather than through asset sale or transfer. The Companies Law and Investment Law are usually implemented in this case.

The Role of EETC in Central Planning

According to the Electricity Law, EETC, which currently owns and operates the transmission network and is the offtaker in all government-owned generation projects and most private utility-scale projects (and which will become the transmission system operator in the new wholesale electricity market), is tasked with administering the electricity supply in Egypt. This is done in conjunction with EgyptERA, which oversees supply, pricing, licensing and all matters of a regulatory nature in the electricity market in Egypt and ensures fair competition between the various players in the market.

EETC has the responsibility of preparing and issuing a yearly report on supply, demand, and balancing of electricity, as well as forecasting and medium to long-term planning for electricity needs. According to the amendment to the Electricity Law passed in June 2021, issued by Law No 70/2021, EEHC should support EETC in its role of carrying out studies and planning for the expansion of electricity generation as well as interconnection projects and power export to other countries during the transitional phase, until the full de-coupling of the electricity sector in Egypt.

Over the past three years, there have been two main changes in the legislative framework governing the electricity sector in Egypt, in addition to a number of facilitations announced in 2022 for projects ahead of the 27th session of the Conference of the Parties (COP 27) to the United Nations Framework Convention on Climate Change (UNFCCC) held in Egypt in November 2022.

Law No 70/2021

Published on 13 June 2021, amending the Electricity Law, this extends the transitional phase for realising the electricity sector liberalisation to ten years instead of eight years, and tasks EEHC with a supporting role in connection with planning for the expansion of generation and transmission capacity in Egypt, as well as the interconnection with and power export to other countries.

Circular No 2/2020, as Amended by Circular No 6/2022

Published on the website of EgyptERA on 19 May 2020 and amended on 24 February 2022, this restructured the net-metering scheme in Egypt. The circular puts in place a number of new parameters, which initially limited the setting-up of new net-metering projects in Egypt, but these parameters were relaxed in view of COP27 to the following:

  • the generation facility must be located within the premises of the electricity consumer;
  • the consumer may not hold a distribution licence for the same net-metering project;
  • the total capacity generated from solar net-metering projects (past and future) may not exceed 1,000 MW;
  • the installed capacity of the net-metering facility may not exceed the maximum load of the consumer during the year preceding the commercial operation date of the facility;
  • the total contracted capacity on a net-metering basis for solar projects of a single licensee or customer of a distribution company connected to the distribution grids may not exceed 30 MW, with a maximum capacity of 25 MW per single project;
  • in case of interconnection on the medium-voltage networks, an additional study is required, to be performed by the distribution company or a third-party consultant at the cost of the consumer/offtaker, to assess the impact on the grid, provided that no reverse current is fed to the transmission networks of EETC or any of its customers at any point in time;
  • the settlement of net-metering charges for excess capacity fed to the grid must take place annually, after offsetting the consumer/offtaker’s consumption at the end of June of every calendar year, at the price of electricity determined (in EGP/kWh) based on the latest purchase price/tariff contractually agreed between EETC and a solar energy generation company; and
  • a new fee has been introduced – an integration fee – which should represent the cost of balancing the renewable electricity on the grid, depending on the interconnection voltage, which is determined by EgyptERA and reviewed and updated on a regular basis, noting that net-metering projects with a capacity of up to 10 MW (according to EgyptERA Circular No 5/2023 published on 8 June 2023) and self-consumption projects are exempt from such fee.

Circular No 5/2022

Published on the website of EgyptERA on 24 February 2022, this organised the charging of electric vehicles for the first time in Egypt.

Circular No 2/2023

Published on the website of EgyptERA on 3 January 2023, this organises the purchase by the private sector of renewable electricity generated by NREA for the first time in Egypt. It allows three private telecoms companies to transform their entire energy consumption to green, up to the total generation capacity of NREA.

Circular No 3/2023

Published on the website of EgyptERA on 3 January 2023, this organises solar photovoltaic (PV) self-consumption projects in Egypt in detail, which are grid-connected or not connected to the grid, but with a capacity exceeding 500 kW and used for own consumption, not for sale.

While the legislation passed in recent years has not been particularly encouraging for the expansion of the alternative energy market in Egypt, in 2022, EgyptERA relaxed some of the restrictions imposed on electricity generation under the net-metering scheme, and put in place a dedicated electricity charging mechanism. Along with this, a number of mega-scale green hydrogen and ammonia projects and the crafting of national green hydrogen strategy have caused positive movement in the alternative energy market, and the Cabinet of Ministers approved, on 17 May 2023, a number of incentives for green hydrogen projects to be established in Egypt, which are expected to be shortly passed into law. EgyptERA is also expected to issue the guidelines regarding electricity wheeling and banking and the associated charges in the coming months. This is a long-awaited piece of legislation, which will encourage private generation and sizeable offtake of capacity.

The most unique aspect of the power sector in Egypt is that, despite the apparent excess generation capacity, the market continues to offer opportunities to both small and utility-scale generation projects. This may be seen as an anomaly, but in fact, not all installed capacities are currently operational or have available evacuation infrastructure. The country is also concluding a number of power export deals which, together with plans for retiring some of the old and inefficient power generation plants, are expected to offload some of the apparent excess power.

The Egyptian electricity market is expected to be liberalised during the next few years. As it stands, the market continues to be structured around a single-buyer model with EEHC being the main player.

Electricity prices are typically set on a yearly basis by decree of the Minister of Electricity and Renewable Energy, taking into account fuel costs and other grid and infrastructure costs incurred by the ministry. However, the tariffs applicable from 2021 to 2025 were previously announced in advance.

Egypt is currently exchanging 3,000 MW of electricity with Saudi Arabia, 250 MW with Jordan (expandable to about 500 MW), up to 200 MW with Libya, and 80 MW with Sudan (expandable to a total of 1,300 MW). The government also signed a framework agreement with Cyprus and Greece in May 2019 to allow the exchange of 2,000 MW with them, and a memorandum of understanding in November 2019 to allow the exchange of power between Egypt, Jordan and the Gulf Cooperation Council (GCC) countries. Furthermore, Egypt is part of an initiative to build three synchronous grids to achieve cross-regional interconnection through ultra-high voltage (UHV) lines, collecting large-scale hydro and solar power from Central and Northern Africa and delivering it to Europe and Asia, positioning Egypt as an electricity hub and corridor.

According to the latest statistics published by EEHC, the total installed electricity capacity in 2020/2021 was 58,818 MW:

  • 50,922 MW from thermal plants owned by EEHC and its affiliated companies;
  • 2,048 MW from private sector thermal BOOT plants;
  • 2,832 MW from hydro plants; and
  • 3,016 MW from renewable wind and solar plants.

The peak load was 31,900 MW, and the total power generated countrywide was 204,794 GWh.

In April 2022, the alternative energy figures published by NREA for installed capacities, including both the public and private sectors, were testament to progress in the alternative energy sphere:

  • 2,832 MW hydro power;
  • 1,707 MW solar PV power;
  • 1,635 MW wind power;
  • 56 MW concentrated solar power (CSP); and
  • 56 MW biomass.

As the electricity market unbundling and liberalisation has not yet been implemented, there are no concentration limits in place regarding the percentage of electricity supply controlled by one entity. 

There is currently no competitive electricity market in Egypt. However, according to the Electricity Law, EgyptERA is responsible for ensuring competitiveness in the market.

UNFCCC and the Kyoto Protocol

Egypt is a party to both the UNFCCC and the Kyoto Protocol, by virtue of their ratification on 5 March 1995 and 12 December 2005, respectively. The Kyoto Protocol binds the state parties included in the Annex to reduce their greenhouse gas (GHG) emissions to certain targets over the course of commitment periods. While Egypt is not bound by specific emission targets, as it is not an Annex I Party, it is involved in the Protocol’s Clean Development Mechanism (CDM), which allows states with emission-reduction commitments to implement emission-reduction projects in a developing state, thereby earning saleable certified emission reduction (CER) credits equivalent to the tonnes of CO₂ reduced.

Paris Agreement

Egypt also signed the Paris Agreement on 22 April 2016 and ratified it on 29 June 2017. The agreement’s main aim is to strengthen the global response to the threat of climate change by keeping the global temperature rise in the 21st century well below 2°C above pre-industrial levels and to pursue efforts to limit the temperature increase to 1.5°C. Additionally, the agreement aims to increase the ability of countries to deal with the impacts of climate change, and to make finance flows consistent with low GHG emissions and a climate-resilient pathway. The agreement also provides for an enhanced transparency framework for climate action and support.

No official retirement plan for old carbon-based or inefficient electricity generation facilities in Egypt has been announced. However, this is understood to fall within the plan of the Ministry of Electricity and Renewable Energy, since the facilities are all owned by its affiliated companies.

Renewable Energy Targets

The latest renewable energy targets announced by the Egyptian government are 20% of peak load by 2022 and 42% of total installed capacity by 2035 (1.98% hydro, 5.52% CSP, 14.04% wind and 21.13% PV, in addition to the 57.33% conventional share). 

The country is largely relying on private investment in the alternative energy field, especially in wind and solar generation. The latest announced prices received by the second half of 2020 for BOO projects were as low as USD0.02/kWh for solar and USD0.03/kWh for wind (which went down to less than USD0.025/kWh in the first half of 2022) for wind, and the Ministry of Electricity and Renewable Energy might even call for auctions to bring generation prices down further.

Incentives for Small-Scale Electricity Generation

In 2013, Egypt introduced a net-metering scheme to promote distributed solar, which was revamped in 2018 to increase the capacity of net-metered projects from 5 MW to 20 MW, then to 25 MW in February 2022. Integration fees were waived for up to 10 MW projects as of June 2023.

Incentives for Utility-Scale Electricity Generation

In September 2014, the government launched an ambitious feed-in tariff programme for the generation of 4.3 GW of solar and wind energy projects. The programme was rolled out through two Prime Ministerial Decrees, No 1947/2014 published on 27 October 2014, and No 2532/2016 published on 29 September 2016. Under the first regulatory period governed by the first of these decrees, solar projects between 20 MW and 50 MW were paid a tariff of USD0.1434/kWh and wind projects of the same capacity a tariff between USD0.046/kWh and USD0.1148/kWh. Under the second regulatory period governed by the second decree, these tariffs were reduced for the same capacity to USD0.084/kWh for solar projects, and between USD0.04/kWh and USD0.0796/kWh for wind projects. The solar programme was a success and led to the creation of the 1,465 MW Benban Solar Park in the south of Egypt in Aswan with a total investment cost of about USD2 billion, but the wind programme targets were unfortunately not achieved.

In Egypt, the main laws governing the establishment and operation of electricity generation facilities are the Electricity Law and its Executive Regulations issued by Decree of the Minister of Electricity and Renewable Energy No 230/2016. Renewable energy facilities are also governed by Renewable Energy Law No 203/2014, and nuclear power plants are governed by Nuclear Activities Law No 7/2010 and Nuclear Power Plants Construction Oversight Authority Law No 209/2017.

There are six main types of approval required for the construction and operation of electricity generation facilities in Egypt.

Approvals Related to the Project Company

  • Corporate approvals, including the incorporation of the project company before the General Authority for Investment and Free Zones (“GAFI”) and its commercial and tax registration.
  • Land approvals, depending on the location of the project site.
  • Environmental approval, which is related to the project location and generation activity, and which is issued by the Egyptian Environmental Affairs Agency (EEAA) in co-ordination with NREA. The granting of approval follows a detailed environmental impact assessment process involving public hearings.
  • A building permit issued by the local planning department of the governorate concerned, essentially for the approval of any civil works at the facility.
  • Operating approval, which is issued by EgyptERA in the form of an initial interim generation licence, then a final generation licence that must be renewed on a yearly basis throughout the lifetime of the project.

Approval Related to the Contractor and/or Operator

The local Engineering, Procurement and Construction (EPC) contractor(s) and Operation and Maintenance (O&M) contractor(s) must be registered with the Egyptian Federation for Construction and Building Contractors (EFCBC) in order to be able to carry out construction work and/or maintenance of power plants in Egypt. Furthermore, solar installers must be accredited by NREA based on a bronze-to-platinum ranking mechanism in order to comply with the installation activities’ rules.

All power generation facilities connected to the grid or off-grid but with a capacity of more than 500 kWp must obtain a generation licence from EgyptERA.

However, Article 21 of the Executive Regulations of the Electricity Law allows self-consumers of electricity to apply to EgyptERA for an exemption from obtaining the generation licence if certain conditions are cumulatively fulfilled. This is based on Article 13 paragraph 3 of the Electricity Law, which allows EgyptERA to exempt self-consumers of electricity from obtaining a generation licence.

The owner of a generation project must obtain and present to EgyptERA evidence of title to the site where the project will be located in order to be able to obtain the power generation licence for the project.

If the land is not owned by or formally allocated to the generation company, it would typically seek to lease the land on a long-term basis, either through a lease agreement or a usufruct agreement. The same applies for rooftop projects. The easiest route is to try to obtain a plot of land from those allocated to NREA for the establishment of renewable energy projects, as NREA handles the full licensing process for such plots. The charges paid to NREA are equivalent to 2% of the price of the generated electricity per year. If this is not possible, however, or the electricity generation project will not produce renewable energy, the project developer itself will have to seek the relevant approvals.

The obligation to decommission alternative energy projects is mainly contractual. Both the model power purchase agreement developed by EETC for wind and solar projects where EETC is the offtaker, as well as the model usufruct agreement whereby NREA grants land for renewable project developments, contain decommissioning requirements.

The entire transmission network is, according to the Electricity Law, owned and operated by EETC. All associated transmission facilities follow the same ownership and management structure.

The transmission system is fully controlled by the state-owned EETC.

The construction and operation of the transmission system is the sole responsibility of the state-owned EETC.

Chapter 5 of the Electricity Law governs the relationship with private owners of real estate adjacent to electricity utility infrastructure, and mandates that private property is protected as long as there is a substitute location for the electricity infrastructure. If this is not possible, private ownership will have to be maintained unaffected, with adequate compensation being paid to the owner in case of disturbance.

According to the Electricity Law, EETC has monopoly rights to provide transmission services and to construct and operate the entire transmission system all over Egypt.

The Electricity Law requires EETC to allow third parties to use the transmission network without discrimination.

According to the Electricity Law, EgyptERA is tasked with determining the charges for the use of the transmission network.

Article 30 of the Electricity Law requires EETC to grant access to third parties to use the transmission network. Access must be granted without discrimination to ensure that all users have secured access to their electricity needs, in consideration for a tariff determined according to the economic basis ratified by EgyptERA. 

The construction and operation of electricity distribution facilities are governed by the Electricity Law and its Executive Regulations issued by Decree of the Minister of Electricity and Renewable Energy No 230/2016.

The process described for electricity generation facilities in 4.2 Obtaining Approvals for the Construction and Operation of Generation Facilities applies for the licensing of electricity distribution projects.

The construction and operation of electricity distribution projects follow a similar process to that of electricity generation projects described in 4.3 Terms and Conditions Imposed in Approvals for the Construction and Operation of Generation Facilities. A licence cannot be granted for a company to operate a distribution network within the geographic scope of another distribution company.

Most of the distribution network in Egypt is controlled by government companies affiliated to EEHC. Recently, however, private distribution companies have started operating distribution networks in commercial areas and residential compounds. In this case, access to land is acquired on a private basis and all the licensing requirements described in 4.2 Obtaining Approvals for the Construction and Operation of Generation Facilities would also apply in relation to allocation and approvals.

The Ministry of Electricity and Renewable Energy has been working on expanding the total length of the 500 kV grid in Egypt from 2,364 km in 2014 to about 6,006 km in 2020. The total number of 500 kV substations was increased from 18 in June 2014 with a total capacity of 9,800 MVA, to 48 substations with a capacity of 54,050 MVA in 2020. Other upgrades and expansions have been applied to the 220 kV and 66 kV networks and substations, although more work is definitely still needed on the power distribution level. The ministry is studying market needs so as to improve private distribution conditions and encourage private investment in this sector. 

Distribution companies may not operate networks within the geographical scope of other licensed distribution companies.

Electricity distribution is governed by the Electricity Law and its Executive Regulations issued by Decree of the Minister of Electricity and Renewable Energy No 230/2016, as well as by Law No 18/1998.

EgyptERA sets the distribution charges in Egypt, which cannot be exceeded by private distribution companies. The entire charging system is currently being revised, and the market is awaiting the issuance of the revamped rules for the pricing of the different electricity sector services.

Mazghouny & Co

15 Abou El-Feda Street
Zamalek
Floor 5
Unit 18
Cairo 11211
Egypt

+202 2735 2678

contact@mazghouny.com www.mazghouny.com
Author Business Card

Trends and Developments


Authors



Matouk Bassiouny & Hennawy was established in 2005 and has since developed into a premier full-service business law firm in Egypt and the MENA region with offices in Algeria, Sudan, the UAE, and a country desk covering Libya. Its over 180 lawyers are trained locally and internationally in common and civil law systems and are fully conversant in English, Arabic and French. The firm’s finance and projects group – headed by regional managing partner and group head of finance and projects Mahmoud S Bassiouny – represents numerous clients in the energy sector, focusing on areas such as renewable energy, oil and gas, power, nuclear power, gas pipelines, and transmission and distribution assets.

The Development of Green Hydrogen Projects and the Relevant Regulatory Framework

Introduction

The Arab Republic of Egypt (“Egypt”) is a prime location for renewable energy projects due to its sunny weather, high wind speeds, and abundance of land. For the purpose of becoming a green energy hub, Egypt has expressed its intention to increase the quantity of electricity generated from renewable resources to 42% of the total power generated by 2035; of which wind power is expected to make up 14%, hydropower 2%, photovoltaic (PV) 22%, and concentrated solar power (CSP) 4%. Under this plan, most of this capacity is expected to be delivered by the private sector.   

During COP27 held in Sharm El-Sheikh in November 2022, Egypt – acting through the New and Renewable Energy Authority (NREA), the Egyptian Electricity Transmission Company (EETC), the General Authority for Suez Canal Economic Zone, and TSFE Infrastructure & Utilities Sub Fund – signed nine framework agreements with several national and international investors for the purpose of installing and operating green hydrogen and ammonia plants. Such agreements reflect the country’s efforts to attract foreign investment into green hydrogen production.

Green hydrogen is hydrogen generated by renewable energy or from low-carbon power. Green hydrogen is therefore produced through a hydrogen production facility that utilises green electricity to convert desalinated water into hydrogen. Accordingly, the construction of renewable energy plants, including wind farms and photovoltaic plants, is required to feed such facility. 

This article aims to provide a general overview of the legal framework applicable to renewable energy in Egypt with specific focus on the current incentives related to green hydrogen projects. 

Legal framework of renewable energy

Regulatory authorities

EgyptERA: the Egyptian Electric Utility & Consumer Protection Regulatory Agency (“EgyptERA”) is a public authority independent of the electric utility parties that aims to regulate, follow up, supervise and develop all matters relating to electricity, whether generation, transmission, distribution or consumption, in a manner ensuring its availability and quality. EgyptERA is competent to approve the granting, renewal, suspension and cancellation of the permits and licences required to carry out all electricity activities set forth under Electricity Law No 87 of 2015 (the “Electricity Law”).

Pursuant to Article 13 of the Electricity Law, it is prohibited to undertake generation, distribution or sale of power without obtaining the relevant licence from EgyptERA.

EETC: this is a joint stock company fully owned by the state and independent of other electricity companies and electric utility parties. EETC exclusively carries out transmission activities and operation of the grid. Pursuant to Article 34 of the Electricity Law, EETC undertakes the purchase of the power necessary for assisting services, that is, the services procured from electricity production companies for safe and stable operation of the transmission network, including the provision of energy required to make up for electricity losses and to control voltage, and other alternative production capacities, etc.

NREA: this is an economic public authority with a juristic personality and it is subordinated to the Egyptian Minister of Electricity & Renewable Energy. NREA aims to improve and develop renewable energy resources in light of the state’s strategy regarding the power field. 

NREA has the right to execute, operate, and maintain renewable power generation projects either by itself or through third parties, for its benefit or the benefit of third parties, in addition to selling the generated power from such projects to third parties. NREA may incorporate joint stock companies solely or in co-operation with other participants, subject to the approval of the Minister of Electricity.

Contracting methods

Article 2 of the law on encouraging power generation from renewable energy, No 203 of 2014 (the “Renewable Energy Encouragement Law”) lists four contracting methods:

  • Bidding process by NREA – contracting is through a bidding process by NREA for the purposes of establishing renewable energy power plants. The power produced is sold to EETC taking into consideration the price suggested by EgyptERA based on a study submitted by NREA and approved by the Cabinet. 
  • Bidding process by EETC – contracting is through a bidding process by EETC for the building, owning, and operating of renewable energy power plants. The power produced is sold to EETC, pursuant to the conditions and process agreed between EETC and the investor.
  • FiT programme – under this scheme, investors may build, own and operate renewable energy projects and sell electricity to EETC or other licensed distribution companies by virtue of a power purchase agreement, subject to the feed-in tariff for a period not exceeding 25 years, depending on the nature of the project. The state is bound by the feed-in tariff value for a period of not less than two years or until achieving the target capacity from renewable energy, whichever is earlier. In any case, the agreed feed-in tariff is fixed for the lifetime of the contract and any changes made thereto by the Cabinet only apply with immediate effect (rather than retroactively) to contracts which have yet to be entered into.
  • Direct contract with the consumers – an investor may directly enter into bilateral contracts with power consumers to sell the power generated from renewable energy to such consumers, using the transmission and distribution grid, in accordance with the contracted price and duration.

Incentives related to green hydrogen projects

In light of the government’s direction to attract investment into Egypt, Investment Law No 72 of 2017 (the “Investment Law”) was issued, providing several incentives for projects subject to its provisions. This section sets out an overview of the incentives applicable to green hydrogen projects in accordance with the Investment Law, as well as Special Economic Zones Law No 83 of 2002 (the “SEZ Law”).

Investment Law incentives

The Golden Licence

Pursuant to Article 20 of the Investment Law, the Cabinet may grant companies incorporated in order to carry out strategic or national projects relating to, among others, renewable energy activities, one approval (the “Golden Licence”) for the incorporation, operation, and management of the project, including the construction permits and allocation of the real estate properties required for the project. The Golden Licence is effective without the need for undertaking any other procedure.

Cabinet Decree No 56 of 2022 (the “Cabinet Decree”) lists the requirements for obtaining the Golden Licence in respect of Article 20 of the Investment Law.

Pursuant to Article 1 of the Cabinet Decree, in order for an investment project to be deemed as strategic or national in respect of Article 20 of the Investment Law, it must satisfy two or more of the following criteria:

  • it must contribute to increasing exports by exporting at least 50% of its products abroad annually, within a maximum period of three years from the date of starting the activity;
  • it must depend on foreign exchange transferred from abroad through an Egyptian bank for the financing of the project, in accordance with the provisions of Article 6 of the Investment Law and Article 9 of its executive regulation, as well as the standards determined by the board of directors of the Central Bank of Egypt;
  • it must aim to reduce imports, localise the industry and increase the local component in its products, so that 50% or more of the raw materials and production requirements in its products are local, provided that this percentage is calculated by deducting the value of the imported components from the cost of the product;
  • it must be carried out in one of the areas most in need of development, as specified in Cabinet Decree No 7 of 2020;
  • it must contribute to the transfer and localisation of modern and advanced technology to Egypt, and support innovation, development and scientific research, as determined by the Minister of Communications and Information Technology, the Minister of Trade and Industry, or the Minister of Higher Education and Scientific Research, as the case may be;
  • it must aim to secure strategic goods for the country and limit imports;
  • it must intensively utilise national labour, in accordance with the concept stipulated under Article 11 of the executive regulation of the Investment Law; or
  • it must contribute to reducing environmental impact – reducing heat and gas emissions, and improving the climate – as estimated by the competent Minister of Environmental Affairs.

Article 2 of the Cabinet Decree lists the fields in which the Golden Licence can be granted, which include the electricity and renewable energy sector, specifically green hydrogen projects, whether relating to production, transportation, storage, distribution or exportation.

General incentives

All investment projects subject to the provisions of the Investment Law enjoy the general incentives incorporated therein, except for those established under the free-zones regime.

Pursuant to Article 10 of the Investment Law, investment projects benefit from exemptions on stamp duty as well as on the authentication and notarisation fees applicable to:

  • the incorporation of companies and establishments, credit facility agreements and relevant mortgages, for a period of five years from the date of registration in the commercial register; and
  • the land registration contracts necessary for incorporating companies and establishments.

It is worth noting that a unified custom tax rate of 2% is applicable to companies and establishments subject to the Investment Law with regard to all the imported machinery, equipment and devices necessary for their establishment. The unified rate applies to all imports by companies and establishments operating in public utility projects, such as the machines, equipment and devices necessary for their establishment or completion.

Special incentives

Pursuant to Article 11 of the Investment Law, projects that rely on, or produce, new and renewable energy will receive an investment incentive in the form of a 50% discount off taxable net profits, to the extent that the project is established within sector (A), being the geographic areas requiring the most development in respect of the data and statistics issued by the Central Agency for Public Mobilisation and Statistics; and a 30% discount for sector (B), covering the remaining geographical areas within Egypt. Such incentive may not exceed 80% of the paid capital of the project company and may be granted for a period of up to seven years from the starting date of operations.

However, in order for a project to benefit from the incentive listed under Article 11, the following conditions must be fulfilled:

  • A new company or establishment must be incorporated to carry out the investment project.
  • The incorporation of such new company or entity must be within a period of three years from the date of coming into force of the executive regulations of the Investment Law, subject to renewal for a similar three-year period. By virtue of Decree No 22 of 2020, the Cabinet has further extended the period for three years, starting from 29 October 2020.
  • The newly incorporated company or entity must keep regular accounting books and if the company or establishment operates in more than one area (sector (A) or (B) elaborated above), it may benefit from the percentage prescribed for each region, provided that each region has separate accounts.
  • None of the shareholders, partners or owners of establishments has provided, contributed, or used in the incorporation or establishment of the investment project enjoying the incentive, any of the material assets of a company or establishment existing at the time of enforcement of the provisions of the Investment Law, or liquidated that company or establishment during the period set out in paragraph 2 of Article 12 of the Investment Law, for the purpose of establishing a new investment project that enjoys the aforementioned special incentives.

Additional incentives

The Cabinet may issue a decree granting additional incentives to the projects listed under Article 11 of the Investment Law (which includes projects that rely on, or produce, new and renewable energy) as follows:

  • allowing the establishment of special customs offices dedicated to the project’s exports or imports in agreement with the minister of finance;
  • the state may incur the expenses paid by the investor, in whole or in part, to connect the utilities to the real estate properties allocated for the project, upon operation of the same;
  • the state may incur part of the expenses of the technical training provided for the staff;
  • the refund of 50% of the value of the land allocated for industrial projects where production starts within two years of the land delivery date; and
  • the allocation of lands free of charge for some strategic activities, in accordance with the relevant rules prescribed by law.

Upon a proposal by the competent minister, the Cabinet may issue a decree to introduce new non-tax incentives whenever this is necessary.

Private free-zones regime

According to Article 33 of the Investment Law, the creation of a free zone covering a whole city must be through the issuance of a law. The Cabinet may, based on the proposal of the competent minister subject to the approval of the board of directors of the General Authority for Investment and Free Zones, create general free zones to undertake authorised projects, under any legal form, originally for the purpose of export abroad. The decree relating to the creation of the free zone will specify its location and borders. Furthermore, the Cabinet may, based on the proposal of the competent minster, approve the creation of special free zones limited to one or more projects undertaking similar activities.

Pursuant to Article 41 of the Investment Law, projects located within the free zones are not subject to the provisions of the applicable tax laws in Egypt; in fact, general free zones and private free zones are subject to certain specific fees stipulated under the Investment Law.

Special economic zones incentives

The SEZ Law empowers the board of the relevant special economic zone authority to issue the necessary licences for projects established within the Special Economic Zone (SEZ), including construction and environmental licences, as well as licences relating to the establishment and management of the public utilities and infrastructure. In addition, the SEZ Law also empowers the board with all the powers necessary to establish companies and register the same in the commercial register.

Therefore, a green hydrogen project established under the SEZ regime may enjoy several privileges including the following:

  • exemption from taxes and fees relating to revenues from bonds, loans and facilities, as well as any taxes and fees arising out of a merger, demerger, or change in the company’s legal form;
  • exemption from taxes and customs duties on all machinery, equipment and raw material imported for the purposes of the company’s activity;
  • freedom to price products;
  • the non-revocation of licences for real property, except according to the licence terms; and
  • freedom from the need to register items imported for the practice of the activity in the importers register.

It is worth noting that as at the date of preparing this publication, a new draft law setting forth a package of specific incentives related to green hydrogen projects in Egypt has been approved by the government and is expected to be issued soon, subject to the approval of the House of Representatives and ratification by the president of the Republic.

Matouk Bassiouny & Hennawy

12 Ali Genah Street
Garden City
Cairo
Egypt

+202 2796 2042

+202 2795 4221

info@matoukbassiouny.com www.matoukbassiouny.com
Author Business Card

Law and Practice

Author



Mazghouny & Co is a boutique law firm based in Cairo that specialises in projects and infrastructure, energy and power, construction and real estate, financing and corporate matters. The team is modern, dynamic and creative, and it has set out to build a different type of law firm that operates not just as a legal services provider, but also as a business partner. The firm provides top client service through a dedicated, innovative and commercially oriented team and it utilises the latest legal technology in the delivery of its services. It has been privileged to support some of the world’s largest multinational companies, funds, developments, commercial and private lenders, and governments, and counts Acciona Energia, Amarenco, BayWa r.e., EDF Renewables, EETC, Engie, juwi, NREA, Scatec, and Voltalia among its clients. Having advised on Egyptian-based projects for many years, the firm’s lawyers have a wealth of experience and contacts within various industries, particularly renewable energy.

Trends and Developments

Authors



Matouk Bassiouny & Hennawy was established in 2005 and has since developed into a premier full-service business law firm in Egypt and the MENA region with offices in Algeria, Sudan, the UAE, and a country desk covering Libya. Its over 180 lawyers are trained locally and internationally in common and civil law systems and are fully conversant in English, Arabic and French. The firm’s finance and projects group – headed by regional managing partner and group head of finance and projects Mahmoud S Bassiouny – represents numerous clients in the energy sector, focusing on areas such as renewable energy, oil and gas, power, nuclear power, gas pipelines, and transmission and distribution assets.

Compare law and practice by selecting locations and topic(s)

{{searchBoxHeader}}

Select Topic(s)

loading ...
{{topic.title}}

Please select at least one chapter and one topic to use the compare functionality.